About project

MSU-1 GC has completed a road project encompassing sections from the Solntsevo–Butovo–Vidnoye road to the intersection with the M-3 Ukraine–Moskovsky–Sosenki village–Yamontovo village road and then to the Kommunarka–Ostafyevo Airport road. The road in effect serves as a socially important alternative to the Kievskoye and Kaluzhskoye Highways, unloading them by more than 20%. The project involved installing nine traffic lights, 5.6 km of noise barriers, and local wastewater treatment facilities as well as landscaping and improving the surrounding area.

149,179
Total area, m2
Similar projects
Section of the North-East Expressway
  • Utility systems and linear facilities
  • Completed
The new road passes through the Bogorodskoye, Golyanovo, and Metrogorodok Districts in the Eastern Administrative Area of Moscow. The highway includes a 1-km long elevation and a…
See more
Road infrastructure between Lukhmanovskaya Street and the Moscow / Moscow Region border
  • Utility systems and linear facilities
  • Active
Lukhmanovskaya
Moscow, intersection of Lukhmanovskaya Street and Planned Drive No. 45
MSU-1 GC plays a key role in the construction of the North-East Expressway, part of the Moscow High-Speed Diameter, the capital’s brand-new transport artery. The project comprises…
See more
Losinoostrovskaya Street–the North-East Expressway
  • Utility systems and linear facilities
  • Completed
Moscow, intersection of Losinoostrovskaya Street and the North-East Expressway
The new section of the North-East Expressway reduced the traffic load on the outbound arterial roads, the city centre, the Moscow Ring Road, and the Third Ring Road, as it serves…
See more
Krasnogorskaya — Nakhabino overhead power line
  • Utility systems and linear facilities
  • Completed
The two-chain overhead line (OL) 110 kV Krasnogorskaya — Nakhabino carries out the transit of electricity from the 220 kV Krasnogorskaya supply center to the 110 kV Nakhabino…
See more
The Vagankovskaya electrical substation
  • Utility systems and linear facilities
  • Completed
KHoroshyovskaya
Moscow, Khoroshevskoe highway, 43 building 1
The Vagankovskaya electrical substation provides power to engineering and transport infrastructure and housing construction facilities of the Moscow Northern Administrative…
See more
Section from the Shchelkovskoye Highway to the Otkrytoye Highway and Losinoostrovskaya Street
  • Utility systems and linear facilities
  • Completed
Moscow, North-East Expressway, section from the Otkrytoye Highway to the Yaroslavskoye Highway
The constructed road passes through the Bogorodskoye, Golyanovo, and Metrogorodok Districts of Moscow. The highway includes a 1-km long elevation and a double-deck tunnel with…
See more