About project

MSU-1 GC will build a transport interchange hub «Ulitsa Dmitriyevskogo». Thanks to him, the transfer from the metro station «Ulitsa Dmitriyevskogo» of the Nekrasovskaya line to other types of transport will become more comfortable and will reduce travel time.

The project provides for the construction of the technological part of the hub: the exit from the metro station, the boarding area for land-based urban public transport, the TIH terminal building, taking into account the location of waiting rooms and ticket offices.

Similar projects
Section of the North-East Expressway
  • Utility systems and linear facilities
  • Completed
The new road passes through the Bogorodskoye, Golyanovo, and Metrogorodok Districts in the Eastern Administrative Area of Moscow. The highway includes a 1-km long elevation and a…
See more
Road infrastructure between Lukhmanovskaya Street and the Moscow / Moscow Region border
  • Utility systems and linear facilities
  • Active
Lukhmanovskaya
Moscow, intersection of Lukhmanovskaya Street and Planned Drive No. 45
MSU-1 GC plays a key role in the construction of the North-East Expressway, part of the Moscow High-Speed Diameter, the capital’s brand-new transport artery. The project comprises…
See more
Losinoostrovskaya Street–the North-East Expressway
  • Utility systems and linear facilities
  • Completed
Moscow, intersection of Losinoostrovskaya Street and the North-East Expressway
The new section of the North-East Expressway reduced the traffic load on the outbound arterial roads, the city centre, the Moscow Ring Road, and the Third Ring Road, as it serves…
See more
Section from the Shchelkovskoye Highway to the Otkrytoye Highway and Losinoostrovskaya Street
  • Utility systems and linear facilities
  • Completed
Moscow, North-East Expressway, section from the Otkrytoye Highway to the Yaroslavskoye Highway
The constructed road passes through the Bogorodskoye, Golyanovo, and Metrogorodok Districts of Moscow. The highway includes a 1-km long elevation and a double-deck tunnel with…
See more
Planned Drives № 6045 and № 6688
  • Utility systems and linear facilities
  • Completed
Narodnoe Opolchenie
Moscow, Khoroshevo-Mnevniki District
The project involved the construction of Planned Drive No. 6045 (0.394 km) and Planned Drive No. 6688 (0.354 km) as well as an auxiliary 0.072-km drive (from MFK GRAS to…
See more
Road infrastructure on the Elevatornaya Street–Podolskikh Kursantov Street–Krasnogo Mayaka Street section
  • Utility systems and linear facilities
  • Completed
Moscow, Southern Administrative Area, Biryulyovo Vostochnoye, Biryulyovo Zapadnoye, and Chertanovo Tsentralnoye Districts
The Elevatornaya Street–Podolskikh Kursantov Street–Krasnogo Mayaka Street section connects Biryulyovo Vostochnoye, Biryulyovo Zapadnoye, and Chertanovo Tsentralnoye Districts,…
See more