News
On 19 May, Ilya Zyubin, President of MSU-1 GC; Artem Bortnevsky, Executive Director; Alexey Kozlov, Vice President; Dmitry Galimov, Head of the Hydraulic Engineering Department; and other Company representatives took part in a site meeting held by the Federation Council Committee on Economic Poli

Ilya Zyubin, President of MSU-1 GC, and Andrey Belov, First Vice President, visited the Moscow Geological Trust (Mosgorgeotrest) building, which is under refurbishment.
MSU-1 GC launched restoration works for Pavilion No. 67, Soviet Press (formerly Karelia) at VDNH.

MSU-1 GC management held a working meeting at the construction site of Talagi Airport in Arkhangelsk, which had its runway closed for refurbishment on 1 May 2023.

MSU-1 GC will build a school for 400 students on Prichalny Drive in the centre of Moscow. The site area will total 7,594 m2.

MSU-1 GC will refurbish Expo (Pavilion No. 75) at VDNH. The project area will total 53,063 m2.
On 10 April, Sergei Sobyanin, the Moscow Mayor, visited the construction site of the traffic interchange at the intersection of the Moscow Ring Road with Lipetskaya Street.

The Moscow State Expert Assessment (Mosgorexpertiza) has affirmed MSU-1 GC’s A3 rating in the Architectural and Construction Design category, which confirms the Company’s high reliability and low-risk profile.

MSU-1 GC will build a new road linking Solntsevo, Lytkarino, and Zheleznodorozhny. Its total length will exceed 50 km.

MSU-1 GC will perform construction and installation works for a horse riding hall at VDNH. The building area will total 7,774 m2. The arena will be built next to the Centre of National Equestrian Traditions (Pavilions Nos. 41, 42, and 43).