The Vagankovskaya electrical substation
- Utility systems and linear facilities
- Completed
                        KHoroshyovskaya
                      
          
        About project
      The Vagankovskaya electrical substation provides power to engineering and transport infrastructure and housing construction facilities of the Moscow Northern Administrative District. In addition, the substation allows the delivery of electric power to the Moscow power system from the newly commissioned power unit PGU-420 of the Mosenergo OAO CHPP-16 and at the same time increases the reliability of the 220 kV electric network. The power of the substation is 3x160 MVA.
Similar projects
      - Utility systems and linear facilities
- Completed
The new road passes through the Bogorodskoye, Golyanovo, and Metrogorodok Districts in the Eastern Administrative Area of Moscow. The highway includes a 1-km long elevation and a…
  See more
 Road infrastructure between Lukhmanovskaya Street and the Moscow / Moscow Region border
Road infrastructure between Lukhmanovskaya Street and the Moscow / Moscow Region border
  - Utility systems and linear facilities
- Active
              Lukhmanovskaya
          
  Moscow, intersection of Lukhmanovskaya Street and Planned Drive No. 45
  MSU-1 GC plays a key role in the construction of the North-East Expressway, part of the Moscow High-Speed Diameter, the capital’s brand-new transport artery. The project comprises…
  See more
 Losinoostrovskaya Street–the North-East Expressway
Losinoostrovskaya Street–the North-East Expressway
  - Utility systems and linear facilities
- Completed
Moscow, intersection of Losinoostrovskaya Street and the North-East Expressway
  The new section of the North-East Expressway reduced the traffic load on the outbound arterial roads, the city centre, the Moscow Ring Road, and the Third Ring Road, as it serves…
  See more
 Krasnogorskaya — Nakhabino overhead power line
Krasnogorskaya — Nakhabino overhead power line
  - Utility systems and linear facilities
- Completed
The two-chain overhead line (OL) 110 kV Krasnogorskaya — Nakhabino carries out the transit of electricity from the 220 kV Krasnogorskaya supply center to the 110 kV Nakhabino…
  See more
 Section from the Shchelkovskoye Highway to the Otkrytoye Highway and Losinoostrovskaya Street
Section from the Shchelkovskoye Highway to the Otkrytoye Highway and Losinoostrovskaya Street
  - Utility systems and linear facilities
- Completed
Moscow, North-East Expressway, section from the Otkrytoye Highway to the Yaroslavskoye Highway
  The constructed road passes through the Bogorodskoye, Golyanovo, and Metrogorodok Districts of Moscow. The highway includes a 1-km long elevation and a double-deck tunnel with…
  See more
 Planned Drives № 6045 and № 6688
Planned Drives № 6045 and № 6688
  - Utility systems and linear facilities
- Completed
              Narodnoe Opolchenie
          
  Moscow, Khoroshevo-Mnevniki District
  The project involved the construction of Planned Drive No. 6045 (0.394 km) and Planned Drive No. 6688 (0.354 km)
as well as an auxiliary 0.072-km drive (from MFK GRAS to…
  See more