About project
MSU-1 GC plays a key role in the construction of the North-East Expressway, part of the Moscow High-Speed Diameter, the capital’s brand-new transport artery. The project comprises the construction of road infrastructure between Lukhmanovskaya Street and the border with the Moscow Region, from preparing the site to constructing road infrastructure, an overpass along the designed highway, noise barriers, and below-grade pedestrian crossings as well as installing a transformer substation and traffic control devices.
213,878
Total area, m2
Similar projects
Section of the North-East Expressway
- Utility systems and linear facilities
- Completed
The new road passes through the Bogorodskoye, Golyanovo, and Metrogorodok Districts in the Eastern Administrative Area of Moscow. The highway includes a 1-km long elevation and a…
See more
Losinoostrovskaya Street–the North-East Expressway
- Utility systems and linear facilities
- Completed
Moscow, intersection of Losinoostrovskaya Street and the North-East Expressway
The new section of the North-East Expressway reduced the traffic load on the outbound arterial roads, the city centre, the Moscow Ring Road, and the Third Ring Road, as it serves…
See more
Krasnogorskaya — Nakhabino overhead power line
- Utility systems and linear facilities
- Completed
The two-chain overhead line (OL) 110 kV Krasnogorskaya — Nakhabino carries out the transit of electricity from the 220 kV Krasnogorskaya supply center to the 110 kV Nakhabino…
See more
The Vagankovskaya electrical substation
- Utility systems and linear facilities
- Completed
KHoroshyovskaya
Moscow, Khoroshevskoe highway, 43 building 1
The Vagankovskaya electrical substation provides power to engineering and transport infrastructure and housing construction facilities of the Moscow Northern Administrative…
See more
Section from the Shchelkovskoye Highway to the Otkrytoye Highway and Losinoostrovskaya Street
- Utility systems and linear facilities
- Completed
Moscow, North-East Expressway, section from the Otkrytoye Highway to the Yaroslavskoye Highway
The constructed road passes through the Bogorodskoye, Golyanovo, and Metrogorodok Districts of Moscow. The highway includes a 1-km long elevation and a double-deck tunnel with…
See more
Planned Drives № 6045 and № 6688
- Utility systems and linear facilities
- Completed
Narodnoe Opolchenie
Moscow, Khoroshevo-Mnevniki District
The project involved the construction of Planned Drive No. 6045 (0.394 km) and Planned Drive No. 6688 (0.354 km)
as well as an auxiliary 0.072-km drive (from MFK GRAS to…