Road section on Narodnogo Opolcheniya Street
- Utility systems and linear facilities
- Completed
Narodnoe Opolchenie
About project
The new road section, connecting Salyama Adilya Street with Karamyshevskaya Embankment, enabled better transport accessibility within Residential Quarter 75 of the Khoroshevo-Mnevniki District in the north-west of Moscow. The project also included refurbishment of the embankment section from Narodnogo Opolcheniya Street to Salyama Adilya Street. The new road section has one lane for traffic in each direction and is separated from houses by noise barriers.
380
Total area, m2
Similar projects
- Utility systems and linear facilities
- Completed
The new road passes through the Bogorodskoye, Golyanovo, and Metrogorodok Districts in the Eastern Administrative Area of Moscow. The highway includes a 1-km long elevation and a…
See more

- Utility systems and linear facilities
- Active
Lukhmanovskaya
Moscow, intersection of Lukhmanovskaya Street and Planned Drive No. 45
MSU-1 GC plays a key role in the construction of the North-East Expressway, part of the Moscow High-Speed Diameter, the capital’s brand-new transport artery. The project comprises…
See more

- Utility systems and linear facilities
- Completed
Moscow, intersection of Losinoostrovskaya Street and the North-East Expressway
The new section of the North-East Expressway reduced the traffic load on the outbound arterial roads, the city centre, the Moscow Ring Road, and the Third Ring Road, as it serves…
See more

- Utility systems and linear facilities
- Completed
The two-chain overhead line (OL) 110 kV Krasnogorskaya — Nakhabino carries out the transit of electricity from the 220 kV Krasnogorskaya supply center to the 110 kV Nakhabino…
See more

- Utility systems and linear facilities
- Completed
KHoroshyovskaya
Moscow, Khoroshevskoe highway, 43 building 1
The Vagankovskaya electrical substation provides power to engineering and transport infrastructure and housing construction facilities of the Moscow Northern Administrative…
See more

- Utility systems and linear facilities
- Completed
Moscow, North-East Expressway, section from the Otkrytoye Highway to the Yaroslavskoye Highway
The constructed road passes through the Bogorodskoye, Golyanovo, and Metrogorodok Districts of Moscow. The highway includes a 1-km long elevation and a double-deck tunnel with…
See more