Road infrastructure on the Elevatornaya Street–Podolskikh Kursantov Street–Krasnogo Mayaka Street section
- Utility systems and linear facilities
- Completed
About project
The Elevatornaya Street–Podolskikh Kursantov Street–Krasnogo Mayaka Street section connects Biryulyovo Vostochnoye, Biryulyovo Zapadnoye, and Chertanovo Tsentralnoye Districts, previously separated by railroad tracks. The highway provides a transport link between the city’s arterial roads – the Varshavskoye Highway and Lipetskaya Street – crossing the tracks of the Paveletsky railway line of the Moscow Railway above street level.
4,100
Site length, m
Similar projects
- Utility systems and linear facilities
- Completed
The new road passes through the Bogorodskoye, Golyanovo, and Metrogorodok Districts in the Eastern Administrative Area of Moscow. The highway includes a 1-km long elevation and a…
See more
![](/sites/default/files/styles/wide/public/projects/2023-03/img-1674221591-544-988-2et.jpg?itok=qmbN5qPm)
- Utility systems and linear facilities
- Active
Lukhmanovskaya
Moscow, intersection of Lukhmanovskaya Street and Planned Drive No. 45
MSU-1 GC plays a key role in the construction of the North-East Expressway, part of the Moscow High-Speed Diameter, the capital’s brand-new transport artery. The project comprises…
See more
![](/sites/default/files/styles/wide/public/projects/2023-03/DJI_0051.jpg?itok=2HwLVBFL)
- Utility systems and linear facilities
- Completed
Moscow, intersection of Losinoostrovskaya Street and the North-East Expressway
The new section of the North-East Expressway reduced the traffic load on the outbound arterial roads, the city centre, the Moscow Ring Road, and the Third Ring Road, as it serves…
See more
![](/sites/default/files/styles/wide/public/projects/2023-09/nikola-johnny-mirkovic-Z_dnvde5wxc-unsplash.jpg?itok=O6bF9CJM)
- Utility systems and linear facilities
- Completed
The two-chain overhead line (OL) 110 kV Krasnogorskaya — Nakhabino carries out the transit of electricity from the 220 kV Krasnogorskaya supply center to the 110 kV Nakhabino…
See more
![](/sites/default/files/styles/wide/public/projects/2023-09/american-public-power-association-u719UbWj0us-unsplash.jpg?itok=Rz6ZqQcX)
- Utility systems and linear facilities
- Completed
KHoroshyovskaya
Moscow, Khoroshevskoe highway, 43 building 1
The Vagankovskaya electrical substation provides power to engineering and transport infrastructure and housing construction facilities of the Moscow Northern Administrative…
See more
![](/sites/default/files/styles/wide/public/projects/2023-06/DJI_0008.jpg?itok=T3ryLWYp)
- Utility systems and linear facilities
- Completed
Moscow, North-East Expressway, section from the Otkrytoye Highway to the Yaroslavskoye Highway
The constructed road passes through the Bogorodskoye, Golyanovo, and Metrogorodok Districts of Moscow. The highway includes a 1-km long elevation and a double-deck tunnel with…
See more