MSU-1 GC was the only bidder in the tender to retrofit the Gorodetsky complex of hydraulic structures (including the construction of an additional lock chamber) and create a shipping channel from Gorodets to Nizhny Novgorod. The additional lock chamber is expected to let larger ships pass through the Gorodetsky complex. Dredging is necessary to enable navigation between Gorodets and Nizhny Novgorod.
MSU-1 GC is delivering comprehensive upgrades of hydraulic infrastructure at the Moscow Basin of Inland Waterways. Although all the mechanisms and structures of the Moscow Canal…